FIFTHTEXAS Posted April 30, 2014 Posted April 30, 2014 HI can anyone tell me the best way to load a group of families from one project to another? what is best procedure? I have a plantroom with mechanical equipment all items I need to put into another project how do I load families thanks Quote
tzframpton Posted April 30, 2014 Posted April 30, 2014 There's no way to do this in a batch form for Loadable Families. This is why most Revit users will keep a very organized directory structure on a network of all company-specific Family content. This is the central source that everyone works from. And if you create project specific Families, it's good practice to keep them updated in this location so you can easily load them into future projects. Quote
tzframpton Posted May 1, 2014 Posted May 1, 2014 Actually, my first post wasn't entirely accurate. Certain things *can* be transferred in batch if you use the Transfer Project Standards tool under the Manage Tab. Things like... Pipe Fittings for all Pipe Types that are defined. Things to that nature. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.