Bennymac777 Posted August 29, 2012 Posted August 29, 2012 I use a building key for building reference (inserted as a xref into the individual drawings) in many of my drawings. I have layers for specific areas and rooms. I turn off the layers on the appropriate drawings (if the drawing is for room 301, I make sure all other layers are off and only 301 are on). My problem come when I add a new layer to the key and since the key in xrefd into many drawings it shows up as always being on. This makes to have to go back and do a little bit of layer control each time I change the xref. Is there a way to help this? VISRETAIN=1 only keeps the layers set to last save and everything added to the xrefs are basically taken from the xref (color, visibility, etc). Is there a way to set a variable so that you have to check the new xref layers before they show up on the referenced drawing? Quote
RobDraw Posted August 30, 2012 Posted August 30, 2012 I think this might be what you are looking for: http://docs.autodesk.com/ACDLTM/2013/ENU/filesAUGMacLT/GUID-A184722C-94FD-4027-9ED7-2C114EC4CC81.htm Quote
Bennymac777 Posted August 31, 2012 Author Posted August 31, 2012 Yeah this is what I have been doing. I guess I was hoping to find a command or variable that did more than notify, but that seems like I am asking for too much. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.