Jump to content

Recommended Posts

Posted
Hey, I just quoted the guy I didn't write it.

 

If you don't know the meaning of the word accurate you might want to think about a career that either involves throwing horseshoes or tossing hand grenades. LoL

 

I know the meaning of the word ACCURACY, do you?

 

As you eluded to, Accuracy is relevant to the subject at hand, hence "horseshoes and hand grenades".

  • Replies 28
  • Created
  • Last Reply

Top Posters In This Topic

  • ReMark

    8

  • Dadgad

    5

  • Pablo Ferral

    4

  • Tyke

    3

Top Posters In This Topic

Posted Images

Posted
"They must be so clear and complete that every one of the users arrives at exactly the same interpretation."

 

That's a great quote ReMark - well done :)

Posted

To put it very simply, you can draw it right, you can draw it fast, or you can draw it pretty. Sometimes you can hit two out of the three.

 

As with any document, keep your audience in mind.

Posted

Using CAD a knowledgeable person should be able to hit all three.

Posted

Thanks very much to all of you for all your help. I really appreciate it.

 

I've learned a few new things and you've really helped me to clarify my thoughts.

 

I have attempted to summarize everyone's contributions here:

http://cadsetterout.com/personal-pos...t-cad-drawing/

 

Cheers,

 

Paul

Posted
I know the meaning of the word ACCURACY, do you?

 

As you eluded to, Accuracy is relevant to the subject at hand, hence "horseshoes and hand grenades".

 

To add to that point with landing large government contracts a quick way to not get any more in the future is to have jobs delayed because of contractors filing complaints that they lost the bid because their estimate was by your drawings and the contractor who won is not installing what your drawings specified.

Not saying to give inaccurate information but in certain situations it is best to just give enough information to convey guidlines, saftey requirements, etc... and let the contractor decide how to meet the end result.

Posted

The problem with letting the contractor decide is sometimes they get carried away and the city/state/government gets billed for something they did not need or want or the contractor botches the job so badly he has to be removed from the project and another contractor has to be brought in, at a higher cost, to remedy the situation. Some, not all, contractors will take short cuts to increase their profit at the expense of the client. I was on a job where the contractor punched a water line through a storm sewer manhole rather than go around it.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...