paisis123 Posted August 4, 2011 Posted August 4, 2011 Okay so i was doing my HVAC/sheet metal drafting all smoothly, doing all the hvac and vents. until, suddenly, and with out warning, an instruction from the booklet was so confusing, i momentary cannot find out what to do. this is my questions in which im stuck. 3. The eastern portion of the split is 10″ wide and connects almost immediately to a 10 × 14 transition piece. The 14″ × 6″ duct continues south to a point near the sink in Bathroom #2 where it splits into two portions. 4. The west portion forms a 4″ × 4″ duct that bends west and connects immediately to the wall outlet scheduled as S-B2. This outlet is located in the toe clearance between the washbasins in Bathroom #2. The 4″ × 4″ duct exits from the west side of the outlet and continues west to end in Bathroom #1. The very end of the duct connects to the 4″ × 12″ wall outlet scheduled as S-B1. Like the other bathroom’s outlet, this outlet in Bathroom #1 is positioned in the toe clearance between the washbasins. so far i have no understanding of what it means. what are toe clearances? this my work so far plate 1.dwg so can u give me a brief explanation. anyone that helps gets a virtual cookie. Quote
rkent Posted August 4, 2011 Posted August 4, 2011 Toe Clearance ? The kick space at the base of any cabinet, approx 3x3 space at the bottom of the cabinet. When standing at a cabinet your toes would hit the cabinet if the face continued flush to the floor, but at the bottom the cabinet juts in and then down giving you a place for your toes. With heating coming from that space it makes it comfortable while standing in front of the mirror, etc. Chocolate chip for me please. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.