diarmuid Posted November 3, 2010 Posted November 3, 2010 I am currently modelling in two packages, a piping package called PDS which is an Intergraph package. i import these files into Navisworks via an nwc file, no poblem there. it interact correctly with this model. form this i can read the pipe sizes specs etc. in otherowrds it is not a dumb model. When i import the Revit model via the same method. and when i run a clash report beetween the tw, the revit model will trow up two clashes per actual clash. in other words when say a pipe penetrates a wall (a hard clash) it should only really detect it as a single clash (pipe v wall). However, it detects the front face of the wall and the back face of the wall?! Has this happend to anyone out there, and if so have you solved the issue or is it a software glich? Any input on this would be greatlly appreciated Regards Diarmuid Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.