I have two surfaces. An EG Surf and a Surveyed Surf. I need to splice the surveyed surf into the EG. The EG is much bigger than the Survey and etirely covers the survey surf.
I want the two surfaces to tie in/splice together smoothly. So I thought I would add a 20' or 50' buffer around the surv...